Vaillant auroTHERM exclusive VTK SERIES Installation Manual Page 35

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 34
Flat roof fitting and installation 5
0020077994_02 auroTHERM exclusive Installation manual 35
5.1.1.3 Transporting collectors
1. To protect the collectors against damage, always trans-
port them when they are standing horizontally.
2. Transport the collectors to the roof using suitable aids.
5.1.2 Complying with clearances and installation
clearances
During storms, strong wind forces occur along the edges of
flat roofs.
When defining the installation position, maintain an edge
clearance of at least 1 m from the roof edge.
5.1.3 Selecting suitable connection
Select the appropriate connection for the collectors.
Ensure that the solar fluid flows through the collectors
either from left to right or from right to left.
Conditions: Number of VTK 1140/2 collectors: 1 7
max. 7 x VTK 1140/2
Switch up to 7 VTK 1140/2 units in series (according to
the 14 m² aperture surface area).
Conditions: Parallel connection, aperture surface area: 7 m²
Always connect as many collectors as possible in series,
even when several collector rows are arranged on top of
each other.
Note
Up to an aperture surface area of 7 m²
(accordingly for 3 pcs VTK 1140/2 + 1 pc
VTK 570/2), you must switch the collectors
in series.
Conditions: Parallel connection, aperture surface area: 14 m²
Set up several parallel collector rows and connect these
hydraulically in parallel.
Always connect as many collectors (at least 7 m²) as
possible in series.