7 Installing the 160 mm diameter and 200 mm diameter systems
26 Installation manual Air/flue gas system 0020058722_04
7.3.2 Installing the roof duct
5
4
3
2
1
1. Insert the vertical roof duct (1) into the pitched roof tile
(2) or the flat roof penetration collar from above.
2. Align the roof duct vertically and secure the clamp (3) to
a rafter or the ceiling.
3. Install the extensions (4) and, if necessary, the inspec-
tion openings (5).
7.3.3 Installing the stainless-steel roof duct
1
2
3
1 Roof duct
2 Pitched roof tile
3 Fastening clamp
1. Place the roof duct (1) on the pitched roof tile (2) or flat
roof penetration collar.
2. Connect up all the flue components above the roof (ex-
tensions, opening piece, clamps).
3. Attach the roof duct fastening clamps (3) to the rafters
or ceiling.
4. For the area above the roof, refer to the section
Installing the flue gas pipe on the external wall
( Page 26).
5. Install the roof duct. ( Page 26)
7.4 Installing the flue gas pipe on the external
wall
System diagram
1
2
3
4
6
7
8
9
10
5
11
12
13
1 Opening piece
2 Clamp
3 Roof duct
4 Rafter mounting
5 Pitched roof tile
6 Extension
7 Pipe bracket
8 Inspection element
9 Support elbow
10 Support console
11 Product connection
12 Inspection elbow
13 Internal extension
Observe the static dimensions and precautions when in-
stalling an offset.
7.4.1 Static dimensions
Danger!
Risk of injury due to falling parts.
Exceeding the static dimensions may lead to
mechanical damage to the flue gas guiding.
In extreme cases, parts may become loose
from the wall and fall, thus endangering per-
sons.
During installation, observe the static di-
mensions.
Secure at least every second extension to
the external wall using a pipe clamp.