7.20 Removal of printed circuit
boards (PCBs)
Before commencing work on PCB
replacements carry out the following:-
Diagnose which board requires
changing using the fault finding
guide (see section 8: Fault finding).
Turn off the boiler as in section
7.1.1.
Remove front casing as in section
7.1.3.
Lower from control panel as in
section 7.1.6.
Remove back of control box by
undoing the 3 screws (1 and 2,
fig. 65).
7.20.1 Replacement of main
switchboard
Disconnect external wiring from
boiler terminal strip.
Unplug 2 ribbon cables from
control board (2, fig. 75).
Unplug all leads from the main
switchboard.(1, fig. 75) and lift
switchboard carefully out of control
box.
Reassemble in reverse order.
Note: When refitting the main
switchboard ensure that the on/off
control knob spindle (3, fig. 75)
engages correctly into the on/off
switch (5, fig. 75) mounted on the
board.
Carry out electrical checks (see
section 5.1)
7.20.2 Replacement of control board
Unplug 2 ribbon cables from
control board (2, fig. 76).
Push four spring retaining clips
(5, fig. 76) out, and gently lift
control board out of control box.
Reassemble in reverse order.
Note: When refitting the control
board, ensure that the user control
spindles (a, fig. 75) are aligned with
the potentiometer and control switch
holes (b, fig. 75) and that the locating
rib of the potentiometer/switch
correctly engages in the groove of the
control knob spindle.
Carry out electrical checks
(see section 5.1)