Vaillant ecoTEC plus 937 Service Manual Page 33

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 32
Installation and maintenance instructions ecoTEC plus 937 0020031552_06 33
Pull the electronics box forward and lower.
Unclip the back cover of the electronics box and lift
the cover upwards to reveal the connections.
1
2
3
Fig. 4.16 Cable run on the underside of the unit
Feed the wiring harness (2) of the shift load storage
tank with the grommets (3) through the cable entries
provided on the shift load storage tank and on the
combi boiler.
On the combi boiler use the cable entry at the very
front (1).
Fix the grommets to the cable entries using the
spring clamps provided.
-+789 LN 345
X31
X12
1
2
3
5
4
Fig. 4.17 Cable routing in the electronics box
Run the pump cable X12 (3) outside the electronics
box.
Push the plug X12 of the pump cable onto the plug
socket X12 (5) on the printed circuit board.
Run the sensor cable (1) with plug X31 to the printed
circuit board.
Push the flat connector X31 onto the plug socket X31
(2) (left-hand side of the printed circuit board).
Fix the cable (4) in the electronics box via the cable
clamps.
>
>
>
>
>
>
>
>
>
5.19.3 Establishing the power supply
b
Caution!
Risk of damage to the appliance.
The electronics may be damaged via a mains
supply at terminals 7, 8, 9 and "BUS".
Only connect the mains supply cable to the
terminals marked for the purpose.
-+789 LN 345
-+789 LN 345
Fig. 5.18 Connecting the power supply
Run the flex through the cable entries provided in the
combi boiler and in the electronics box and tighten
the cable clamps.
Connect the flex to terminals L and N and the earth
connection of the terminal block.
Green-yellow wire
(earth)
Boiler connection
earth symbol
Blue wire
(neutral)
Boiler connection N
Brown wire
(live)
Boiler connection L
i
Make sure that the cables are securely fixed
in the terminal blocks.
Refit the electronics box cover by pushing into place
until it clips back into position ensuring all wires are
not trapped or pinched.
Lift the electronics box up and secure.
>
>
>
>
>
Sequence of operations during installation 5
Page view 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 79 80

Comments to this Manuals

No comments