Vaillant TURBOmax VUW 242 E Service Manual

Browse online or download Service Manual for Water heaters & boilers Vaillant TURBOmax VUW 242 E. Vaillant TURBOmax VUW 242 E Technical data User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
For the installer
24/2 E
28/2 E
GB
Instructions for Installation and Servicing
turboMAX pro
Wall hung room sealed fan assisted
combination and system boilers
833792_41GB_012005.qxd 09.03.2005 16:47 Uhr Seite 1
Page view 0
1 2 3 4 5 6 ... 43 44

Summary of Contents

Page 1 - For the installer

For the installer24/2 E28/2 EGBInstructions for Installation and ServicingturboMAX proWall hung room sealed fan assisted combination and system boiler

Page 2 - Table of Contents

4 General RequirementsInstructions for Installation and Servicing turboMAX pro R310Important!This appliance must be earthed.4.8 Guide to system requir

Page 3 - List of contents 1

General Requirements 4Instructions for Installation and Servicing turboMAX pro R3 114.8.6 Circulating pumpThe circulating pump is included in the boil

Page 4 - 2 Introduction

Fig. 5.2: Free space required for installationSelecting position of boilerRefer to „Boiler location“ for information regarding sit-ing the appliance.

Page 5 - Boiler Specification 3

Boiler Installation Sequence 5Instructions for Installation and Servicing turboMAX pro R3 135.2 Using boiler templateFix the paper template to the wal

Page 6 - 3 Boiler Specification

5.7 Gas supply• Connect the 15 mm compression gas service cock (1)supplied with the appliance (2) and tighten.• Connect a gas supply pipe of not less

Page 7

Boiler Installation Sequence 5Instructions for Installation and Servicing turboMAX pro R3 155.8 Cold water mains inlet and hot water outletFlush all f

Page 8

5 Boiler Installation SequenceFig. 5.9: Wiring systemFig. 5.10: Exposed rear view of switchgear cabinet• Connect the power supply cord as follows (Fig

Page 9

Boiler Installation Sequence 5Instructions for Installation and Servicing turboMAX pro R3 17Abb. 0.0 BildunterschriftFig. 5.11 Connection wiringNL987F

Page 10 - 4 General Requirements

5 Boiler Installation SequenceConnection details for external time switches andboiler terminal strip.Fig. 5.13 shows the connection details where a ti

Page 11 - General Requirements 4

Boiler Installation Sequence 5Instructions for Installation and Servicing turboMAX pro R3 19Fig. 5.14Thermostatic radiator valvesThe boiler has a buil

Page 12

Table of ContentsInstructions for Installation and Servicing turboMAX pro R321 List of Contents . . . . . . . . . . . . . . . . . . . . . 31.1 Cont

Page 13

6 Commissioning Part IInstructions for Installation and Servicing turboMAX pro R3206 Commissioning Part I6.1 Preliminary electrical checksCheck the el

Page 14

Gas supply adjustments (Commissioning Part II) 7Instructions for Installation and Servicing turboMAX pro R3 217 Gas supply adjustments7.1 Gas inlet wo

Page 15

7 Gas supply adjustments (Commissioning Part II)Instructions for Installation and Servicing turboMAX pro R322Set the DHW temperature control to maximu

Page 16 - RT 24V 230V RT 230V

Gas supply adjustments (Commissioning Part II) 7Instructions for Installation and Servicing turboMAX pro R3 23Burner Pressure turboMAX pro 24/2 EDeliv

Page 17 - 5.13 Electronic board layout

7 Gas supply adjustments (Commissioning Part II)Instructions for Installation and Servicing turboMAX pro R3247.5 Fit combustion chamber coverCarefully

Page 18

Functional Checks (Commissioning Part III) 8Instructions for Installation and Servicing turboMAX pro R3 258 Functional Checks 8.1 Functional checksPro

Page 19 - Fig. 5.14

8 Functional Checks (Commissioning Part III)Instructions for Installation and Servicing turboMAX pro R3268.3 Adjusting pump speedThe unit is fitted wi

Page 20 - 6 Commissioning Part I

Servicing 9Instructions for Installation and Servicing turboMAX pro R3 279 Servicing9.1 Initial InspectionTo ensure the continued safe and efficient o

Page 21 - 7 Gas supply adjustments

9 ServicingInstructions for Installation and Servicing turboMAX pro R3289.2 Cleaning the burner and primary heat exchanger• Turn off the boiler.• Isol

Page 22

Fault Finding 10Instructions for Installation and Servicing turboMAX pro R3 29To reset the appliance after a lockout (either burnerlockout illuminate

Page 23

List of contents 1Instructions for Installation and Servicing turboMAX pro R3 31 List of contents1.1 Contents included with boilerEnsure that all con

Page 24 - Fig. 7.4: Fit boiler casing

10 Fault FindingInstructions for Installation and Servicing turboMAX pro R330Ensure boiler mainON/OFF control is setto position "1" Yes Go t

Page 25 - Fig. 8.2 Functional check

Fault Finding 10Instructions for Installation and Servicing turboMAX pro R3 31Sheet BCheck operation of pump and fanTurn off the main ON/OFF control t

Page 26 - Fig. 8.3: Pump speed

10 Fault FindingInstructions for Installation and Servicing turboMAX pro R332Check central heating and controlsEnsure that radiator temperature contro

Page 27 - Servicing 9

Fault Finding 10Instructions for Installation and Servicing turboMAX pro R3 33Does fan run after approx. 30 secs.?Check flue and ignition systemNoChec

Page 28 - 9 Servicing

10 Fault FindingInstructions for Installation and Servicing turboMAX pro R334Check gas valve and central heating system pressureDoes burner light 1sta

Page 29 - Fault Finding 10

Fault Finding 10Instructions for Installation and Servicing turboMAX pro R3 35Does flame indicator glow andflames increase in size to full gasrate aft

Page 30 - 10 Fault Finding

10 Fault FindingInstructions for Installation and Servicing turboMAX pro R336Draw hot water at high rate YesCheck hot water flow rate and temperature.

Page 31

Diagrams 11Instructions for Installation and Servicing turboMAX pro R3 37power supplyF2AL2N1main switchmaintransformer230V20VairpressureswitchfanpumpN

Page 32

11 DiagramsInstructions for Installation and Servicing turboMAX pro R338Switchgear cabinetU100X3T 2= F2T 1,25 = F3X2X2X1242311213141516171819202122234

Page 33

833792_41GB_012005.qxd 09.03.2005 16:47 Uhr Seite 39

Page 34

2 Introduction2.1 General InformationNote!This boiler must be installed and serviced by acompetent person in accordance with the GasSafety (Installati

Page 35

833792_41GB_012005.qxd 09.03.2005 16:47 Uhr Seite 40

Page 36 - Check D.H.W operation

833792_41GB_012005.qxd 09.03.2005 16:47 Uhr Seite 41

Page 37 - Diagrams 11

833792_41GB_012005.qxd 09.03.2005 16:47 Uhr Seite 42

Page 38 - Switchgear cabinet

833792_41GB_012005.qxd 09.03.2005 16:47 Uhr Seite 43

Page 39

833792_42 GB R3 03 2005 Subject to alteration833792_41GB_012005.qxd 09.03.2005 16:47 Uhr Seite 44

Page 40

Boiler Specification 3Instructions for Installation and Servicing turboMAX pro R3 5turboMAX pro 24/2 E turboMAX pro 28/2 E Units(VUW GB 242/2-3) (VUW

Page 41

3 Boiler SpecificationInstructions for Installation and Servicing turboMAX pro R363.3 Functional DiagramFig. 3.2: Functional Diagram1 Air duct2Fan3 Ma

Page 42

General Requirements 4Instructions for Installation and Servicing turboMAX pro R3 74 General Requirements4.1 Related DocumentsThe installation of the

Page 43

4 General Requirements4.4.2 Rear outlet flue system (100 mm outside diameter)The rear outlet horizontal flue system (Art. No. 303 817)is suitable for

Page 44

General Requirements 4Instructions for Installation and Servicing turboMAX pro R3 94.4.4 Flue terminationThe following details refer to both flue syst

Comments to this Manuals

No comments