Vaillant ecoMAX 646 Service Manual Page 40

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 39
40
fig. 69
GW 607/0
fig. 70
GW 646/0
fig. 71
GW 647/0
7.13 Replacement of automatic
air release
Turn off boiler as in section 7.1.1.
Remove front casing as in section
7.1.3.
Release CH water pressure and
drain boiler as in section 7.1.2.
Lower front control panel as in
section 7.1.6.
Unscrew cap (2, fig. 68) of auto air
release and remove inner
components.
Replace with new inner
components and reassemble in
reverse order.
Refill and repressurise the boiler
(see section 5.4).
7.14 Replacement of automatic
bypass
Turn off boiler as in section 7.1.1.
Remove front casing as in section
7.1.3.
Release CH water pressure and
drain boiler as in section 7.1.2.
Lower front control panel as in
section 7.1.6.
Remove spring clip (1, fig. 66).
Disconnect wires from overheat
thermostat (2, fig. 66).
Remove temperature gauge phial
from primary flow pipe.
Undo unions (3, fig. 66). Remove
bypass/connecting pipe.
Undo union (1, fig. 69) to remove
bypass.
Reassemble in reverse order using
sealing washers supplied.
Refill and repressurise the boiler
(see section 5.4).
7.15 Replacement of diverter
valve
Turn off boiler as in section 7.1.1.
Remove front casing as in section
7.1.3.
Release CH water pressure and
drain boiler as in section 7.1.2.
Open hot water taps.
Lower front control panel as in
section 7.1.6.
Remove pump as in 7.12
Remove three screws (1, fig. 70)
and pump support bracket (2, fig.
70).
Remove clip and disconnect pressure
tube (1, fig. 71) from diverter valve.
Undo nut (2, fig. 71) and
disconnect pressure guage tube.
Disconnect union (6, fig. 71).
Disconnect electrical connections
from DHW microswitch (3, fig 71).
Remove clip (4, fig. 71) by pulling
down.
Undo two unions (5, fig. 71).
Undo union (3, fig. 72).
Carefully pull diverter valve and
cold water inlet pipe away from
DHW heat exchanger Lift valve and
cold water inlet pipe (1, fig. 72)
out of boiler.
Reassemble in reverse order.
Carry out electrical checks (see
section 5.1).
Refill and repressurise the boiler
(see section 5.4).
Page view 39
1 2 ... 35 36 37 38 39 40 41 42 43 44 45 ... 59 60

Comments to this Manuals

No comments