Vaillant Flue pipe Specifications Page 26

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 25
26 Instructions for installation and servicing ecoTEC 839592_12
4.14.2 Connection to the main supply
Fig. 4.13 Opening the electronics box
Remove the front case and lower the control panel.
Unclip the bottom of the terminal box cover and hinge
back to reveal the connection plugs.
Feed the power supply flex into the appliance and the
control panel through the cable clamps provided and
tighten.
-+789 LN 345
-+789 LN 345
Fig. 4.14 Wiring system
Connect the flex to the L, N and earth plug to the
terminal block.
Green/yellow (earth) wire – boiler terminal Earth sign
Blue (neutral) wire – boiler terminal N
Brown (live) wire – boiler terminal L
Note
Do not connect any power voltage to the
connections 7-8-9 or BUS (+,-).
Note
Ensure that the wires are securely fixed in the
terminal block.
Refit the terminal box cover by pushing into place
until it clips back into position.
Raise the control panel.
4 Boiler installation sequence
Page view 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 63 64

Comments to this Manuals

No comments